Pages

Monday 7 May 2012

Updates - May 2012 (2nd)

 
Chesterfield Canal  - A Richlow Guide
 
Page 16. Boat Inn at Hayton
 
This pub has closed.  We do not normally advise of individual closures as the situation changes so quickly.  But there are mentions of the pub in both the Navigation Notes, and the "Hayton" paragraph.
 
Page 32. Hollingwood Common Tunnel
 
The entrance to the tunnel has been cleared and made safe.  Added - "The entrance on the far bank, with a grill and a fence, can be seen from the towpath near Works Road Bridge (8c)."
 
Page 41. Contact details
 
Tripboat Seth Ellis (Retford)  -  07925 851569 and sethellis@chesterfield-canal-trust.org.uk
 
Chesterfield Canal Partnership  -  Hollingwood Hub, 22 Works Road, Hollingwood,
Chesterfield S43 2PF       01246 477502
geraint.coles@derbyshire.gov.uk
 

No comments:

Post a Comment