Pages

Wednesday, 27 February 2013

Chesterfield Canal - Worksop Towpath

 
Chesterfield Canal Guide
   
Maps 8 and 7  Towpath Improvements in Worksop, between Sandy Lane Bridge (41a) and Bridge Street Bridge (42)
 
Contractors on behalf of CRT are removing the existing towpath surface and installing a full replacement.
 
The work has been delayed, twice, by snow but is now underway, with a work-camp by Stret Lock.  Towpath closures are in place.  This photograph was taken on 27 February 2013, of a workparty between the Lady Lee Arm and Morse Lock (49) Map 8.

No comments:

Post a Comment